Partial modification of the old water network in Shindi
The executive director of Shendi locality, Khaled Abdel Ghaffar Al-Sheikh, announced that the water network operating in Shendi would change gradually and in stages. He said during his inspection of the Square 20 station that the water system could be one of the reasons for the change. water does not flow naturally through pipes to neighborhoods and city squares due to its low… Capacity and limited capacity required after water demand several times higher than before, especially after the war that broke out in Khartoum and the increasing number of expatriates in the locality.
He announced that the change of the water network would begin with two thousand meters of four-inch capacity in the first stage of the line coming out of the Twenty Square water station.
The director of the local water authority, engineer Walid Mahjoub, confirmed that water is available, but is hampered by a number of obstacles, including unstable electricity, the old network of water, its limited capacity and the frequent fractures of the network. conveyor lines, which results in significant wastage of water.
He said they have started to find alternative solutions in order to continue the water service by providing solar power to a number of water stations, replacing some damaged water pipes and increasing the conveyor line capacity to greater capacity.
He pointed out that they are facing the challenge of the summer season and the increasing demand for water with more treatments, so that citizens can benefit from good water service.
Source link